The structure of gas hot blast stove is introduced in detail
time:2021-12-17 views: 1110 author : GACO

   The fuel gas is extinguished in the hot blast stove through the extinguisher to produce high-temperature fuel gas. The hot blast stove with enhanced heat exchange measures transmits the heat of high-temperature gas to the heated air. After heat transmission, the temperature of high-temperature gas drops below 250 degrees and is discharged from the blower.

   The air to be heated is strongly escorted to the hot blast stove through the selected blower. The temperature after heat absorption rises to the rated value and is escorted from the hot blast outlet. When the hot blast temperature reaches the rated upper limit temperature, the extinguisher will automatically stop extinguishing, or it will automatically become a small flame. When the hot blast temperature drops to the rated lower limit temperature, the extinguisher will ignite and operate again.

   Gas hot blast stove is an example of energy saving and cleaning. What are the structural components of gas hot blast stove? The composition part can refer to the composition of coal-fired hot blast stove: the coal-fired hot blast stove is composed of furnace discharge, refractory brick, reflector, hot blast stove body, flue and suction pipe, dust collector, chimney and its support, induced draft fan (including regulating valve), blower (including regulating valve) and special temperature measuring instrument.

   That is, the fuel is directly extinguished. After high purification treatment, it forms hot air. After direct contact with materials, it stops heating, drying or baking. The fuel consumption of this method is about half less than that of steam or other indirect heating methods. Therefore, on the premise of not affecting the production and quality, direct high purification hot air can be used. Fuel oil is gaseous fuel, such as gasoline, natural gas and liquid gasoline.


Consultation hotline
  • Landline:0531-83659330
  • Fax:0531-83382689
  • Email:admin@gacoch.com
  • Headquarters address: No. 9 Ningshi Road, Zhangqiu District, Jinan City, Shandong Province
News
GACO  Equipment Joins Hands with State Power Investment to Build Green New Energy
GACO Equipment Joins Hands with State Power Investment to Build Green New Energy

State Power Investment Group Co., Ltd. (referred to as "State Power Investment") is a super large st···

+MORE
102024-01
GACO Joins Hands with Black Cat Group to Build a Smokeless Factory
GACO Joins Hands with Black Cat Group to Build a Smokeless Factory

The coal chemical industry has a wide variety of products, a large economic output, and a wide coverage area, ···

+MORE
052023-09
Tel
0531-83659330
WeChat
WeChat
Message
Top
GACO (Shandong) Intelligent Equipment Co., Ltd. Record n varchar:鲁ICP备17025986号-5
Home
Product
consult
use
serve