During the operation of the drying hot blast stove, some dirt will form more or less due to the magazine in the water. When there are too many impurities, the drying hot blast stove will fail. Therefore, we need to carry out blowdown in daily maintenance. What should we pay attention to in blowdown operation?
As for the drying hot blast stove, before the implementation of blowdown operation, the first point is that the water level in the drying hot blast stove should be adjusted to a level slightly higher than the normal water level. There should be no flowing sound in the blowdown pipe. It is necessary to touch the blowdown pipe outside the blowdown valve by hand. If the sensing temperature is relatively high, it indicates that the blowdown valve is leaking, At this time, it is necessary to check in time, find out the causes, and then deal with them.
The blowdown operation of the drying hot blast stove itself requires regular and uniform blowdown. At least one blowdown is required for each shift. There will be multiple blowdown pipes on a hot blast stove. It is necessary to blowdown each blowdown pipe in turns. It is assumed that only part of the blowdown pipes will be blowdown.
However, if the other part does not discharge sewage, it will lead to the blockage of some sewage pipes, so the water circulation will be damaged. If it is serious, it will also lead to pipe explosion. However, when several drying hot blast stoves use the same blowdown main pipe together, when there is no check valve on the blowdown pipe of each hot blast stove, in this case, it is forbidden to blowdown together. In order to discharge the sewage back, it enters next to other hot blast stoves.
近日,加科与神马集团在能源设备领域的合作取得重要进展。加科顺利完成了为神马集团安装两台油气两用燃烧器和一台燃气···
近日,加科燃烧器成功中标神马集团《降低氮氧化物排放项目》。此次合作不仅标志着加科燃烧器在环保技术领域取得重大突···